Thursday, June 25, 2015

June 2015



The main buoy was also open and the dessicant replaced. All circuitry seemed fine within the buoy and all external connectors were intact.

All three ports for the RM Yound RH/Temp were also tried to see if this will correct the exisitng problem (no data is currently being colected), however there was no change to the status of the instrument.

New anodes are required for the sonde and the main buoy.

The Sontek ADP was retrieved and the data downloaded. The battery was changed and the instrument redeployed. 

Can this information also be hosted online with the CREWS data?




Anchor rope fouling
ADP

Buoy base fouling

Anode disintegration

Probes to be cleaned

Fouling growing beneath casing

Mild erosion on sonde