The Buccoo Buoy was inspected on 12 May 2015. While the anchor ropes and metal base required cleaning, the sonde, probes and protective case were relatively unfouled. Three probes required the copper coating to be replaced.
A calibration was not conducted on this trip, and the sonde was cleaned and re-installed.
Data from the Sontek ADP was collected. The unit seems to be working fine and the data looks good.
The status of RMY RH sensor remains the same.