Hi All,
We lost communication from the Buccoo CREWS in October 2017. It wasn't until March 8th 2018 a team was able to bring in and diagnose the problem.
The unit and its mooring lines were de-fouled. (The fouling at this location is particularly aggressive.) The main battery voltages were found to be low and were replaced. Again, the modem was non-functioning. We will replace the voltage regulator as well.
As for the EXO2, while attempting to calibrate, it was non responsive. After a battery change, same result. This will need to be shipped away for repairs. Also, the central wiper unit needs replacement. I suspect that spending that amount of time in the water while not operating may be the culprit.
Unfortunately, while moving the buoy out of the water and onto the transport vehicle some damage occurred to the frame. A crack near the top and a broken radar reflector. These will be corrected before re-deployment.
As with the Angel Reef CREWS, we are waiting on parts before we can redeploy. As soon as we know the dates, I will update.
*Again, I wish to stress that these units are not being maintained often enough, I am hoping this will be addressed soon.
Cheers,
Jonathan Gomez